operatingFrance
Grand'Maison
Eau d'Olle
Generating capacity1,800 MW
- Stored energy
- 34.8 GWh
- Hydraulic head
- Not published
- Commissioned
- 1985
Project notes
Europe's largest pumped-storage plant; twelve sets split between a surface and an underground powerhouse on the Eau d'Olle
operatingUnited Kingdom
Dinorwig
Closed-loop / lake system
Generating capacity1,728 MW
- Stored energy
- 9.1 GWh
- Hydraulic head
- Not published
- Commissioned
- 1984
Project notes
Europe's fastest-responding big store, inside Elidir mountain between Marchlyn Mawr and Llyn Peris
operatingSpain
La Muela (Cortes-La Muela)
Júcar
Generating capacity1,490 MW
- Stored energy
- 24.5 GWh
- Hydraulic head
- Not published
- Commissioned
- 1989
Project notes
La Muela I (1989) and II (2013) share a plateau basin 500 m above the Cortes reservoir — Europe's largest pumping complex on one site
announcedUnited Kingdom
Coire Glas
Closed-loop / lake system
Generating capacity1,300 MW
- Stored energy
- 30 GWh
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
SSE's Great Glen scheme above Loch Lochy — the UK's first new large PSH in 40 years; FID hinges on the 2026 cap-and-floor award
operatingLuxembourg
Vianden
Our
Generating capacity1,296 MW
- Stored energy
- 4.92 GWh
- Hydraulic head
- Not published
- Commissioned
- 1964
Project notes
SEO's eleven-set plant on the Our; the 200 MW eleventh machine arrived in 2015
operatingUkraine
Dniester PSP
Dniester
Generating capacity1,296 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 2009
Project notes
Four of seven planned 324 MW sets run; the 2,268 MW build-out, due around 2028, would make it Europe's largest
operatingItaly
Entracque (Luigi Einaudi)
Gesso
Generating capacity1,184 MW
- Stored energy
- 17.04 GWh
- Hydraulic head
- Not published
- Commissioned
- 1982
Project notes
Italy's largest hydro plant: the Chiotas (1,064 MW) and Rovina sections share the Piastra lower reservoir on the Gesso
operatingBelgium
Coo-Trois-Ponts
Amblève
Generating capacity1,164 MW
- Stored energy
- 5.82 GWh
- Hydraulic head
- Not published
- Commissioned
- 1971
Project notes
Engie's three-basin plant above the Amblève at Coo, uprated past 1.1 GW in the 2020s
operatingGermany
Goldisthal
Schwarza
Generating capacity1,060 MW
- Stored energy
- 8.48 GWh
- Hydraulic head
- Not published
- Commissioned
- 2003
Project notes
Germany's largest PSH and Europe's first big plant with variable-speed sets, on the Thuringian Schwarza
operatingGermany
Markersbach
Große Mittweida
Generating capacity1,045 MW
- Stored energy
- 4.02 GWh
- Hydraulic head
- Not published
- Commissioned
- 1979
Project notes
Six 175 MW sets in the Erzgebirge above the Große Mittweida; Germany's second-largest store
operatingItaly
Presenzano
Volturno
Generating capacity1,000 MW
- Stored energy
- 7 GWh
- Hydraulic head
- Not published
- Commissioned
- 1991
Project notes
Four 250 MW sets between the Cesima hill basin and the Volturno plain north of Naples
operatingItaly
Roncovalgrande
Closed-loop / lake system
Generating capacity1,000 MW
- Stored energy
- 17.68 GWh
- Hydraulic head
- Not published
- Commissioned
- 1971
Project notes
Pumps from Lake Maggiore 740 m up to Lago Delio; the hall in the cliff holds eight sets
announcedRomania
Tarnița–Lăpuștești
Someșul Cald
Generating capacity1,000 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Studied since the 1980s above the Tarnița reservoir near Cluj; still lacks financing and a start date
operatingSwitzerland
Limmern (Linth-Limmern)
Linth
Generating capacity1,000 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 2016
Project notes
Axpo's cavern plant lifts Limmernsee water 630 m to the dammed Muttsee, 2,474 m up — Europe's highest big reservoir
announcedUkraine
Kaniv PSP
Dnieper
Generating capacity1,000 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Soviet-era project on the Kaniv reservoir repeatedly restarted by Ukrhydroenergo; construction remains suspended
operatingItaly
Edolo
Oglio
Generating capacity977.5 MW
- Stored energy
- 4.89 GWh
- Hydraulic head
- Not published
- Commissioned
- 1985
Project notes
Eight sets on the Oglio at Edolo fed from Lago d'Avio; commonly rounded to a gigawatt
operatingFrance
Montézic
Truyère
Generating capacity910 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1982
Project notes
Four 227 MW sets underground on the Truyère; EDF's second-largest storage plant
operatingGermany
Wehr
Wehra
Generating capacity910 MW
- Stored energy
- 6.07 GWh
- Hydraulic head
- 600 m
- Commissioned
- 1975
Project notes
The Hornberg basin sits 600 m above the Wehra valley — the biggest machine in the Black Forest group
operatingLithuania
Kruonis
Nemunas
Generating capacity900 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1992
Project notes
Four 225 MW sets against the Kaunas reservoir on the Nemunas, built to firm the Baltic grid, with room for a fifth unit
operatingSwitzerland
Nant de Drance
Closed-loop / lake system
Generating capacity900 MW
- Stored energy
- 20 GWh
- Hydraulic head
- Not published
- Commissioned
- 2022
Project notes
Six variable-speed sets between the Emosson and Vieux Emosson lakes above the Rhône's Trient gorge; 20 GWh of storage
operatingPortugal
Gouvães
Tâmega
Generating capacity880 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 2022
Project notes
Pure pumping plant of Iberdrola's Tâmega 'giga-battery', working against the Daivões reservoir
operatingBulgaria
Chaira
Closed-loop / lake system
Generating capacity864 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1993
Project notes
The Balkans' largest PSH, below the Belmeken reservoir; offline after a March 2022 turbine failure, with unit 2 back at 210 MW in May 2025 and two more sets due through 2026
operatingSpain
Villarino
Tormes
Generating capacity857 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1970
Project notes
Six sets 400 m underground pump the vast Almendra reservoir on the Tormes against the Duero canyon
operatingFrance
Revin
Meuse
Generating capacity808 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1976
Project notes
Upper basin on the plateau above the Meuse loop at Revin — lowland France's counterpart to the Alpine stores
operatingFrance
Super Bissorte
Arc
Generating capacity742 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Bissorte's reversible extension in the Maurienne, working the 1930s Bissorte dam against the Arc valley floor
operatingPortugal
Frades II (Venda Nova III)
Cávado
Generating capacity736 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 2017
Project notes
Two 368 MW variable-speed sets — among Europe's largest such machines — on the same Rabagão–Cávado drop as Frades I
operatingSlovakia
Čierny Váh
Čierny Váh
Generating capacity735.16 MW
- Stored energy
- Not published
- Hydraulic head
- 434 m
- Commissioned
- 1981
Project notes
The largest power station in Slovakia of any kind; upper basin dug into the ridge above the Čierny Váh valley
operatingAustria
Malta-Hauptstufe
Möll
Generating capacity730 MW
- Stored energy
- Not published
- Hydraulic head
- 1,106 m
- Commissioned
- 1979
Project notes
Europe's highest-head pumped storage; the Rottau powerhouse in the Möll valley works 1,106 m below the Kölnbrein reservoir
operatingPoland
Żarnowiec
Piaśnica
Generating capacity716 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1983
Project notes
Poland's largest PSH, on glacial Lake Żarnowiec — built to partner a nuclear plant that was never finished
under constructionGreece
Amfilochia
Acheloos
Generating capacity680 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Terna's twin upper basins (Agios Georgios 460 MW, Pyrgos 220 MW) share the Kastraki reservoir on the Acheloos; first units due 2027
operatingCzechia
Dlouhé stráně
Divoká Desná
Generating capacity650 MW
- Stored energy
- Not published
- Hydraulic head
- 510.7 m
- Commissioned
- 1996
Project notes
Largest hydro plant in Czechia; twin 325 MW Francis sets under Mravenečník, with the upper basin dug into the Dlouhé stráně summit
operatingNorway
Saurdal
Closed-loop / lake system
Generating capacity640 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Norway's largest pumped-storage plant; two of its four sets are reversible, cycling Blåsjø water in the Ulla-Førre scheme
operatingSerbia
Bajina Bašta
Drina
Generating capacity614 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1982
Project notes
Two 307 MW sets pump 600 m up from the Perućac reservoir on the Drina to Lake Zaovine on Tara mountain
operatingItaly
San Fiorano
Oglio
Generating capacity568 MW
- Stored energy
- Not published
- Hydraulic head
- 1,404 m
- Commissioned
- 1973
Project notes
Italy's highest head — 1,404 m from Lago d'Arno down to the Oglio at Sellero
operatingPortugal
Alqueva
Guadiana
Generating capacity518 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 2004
Project notes
Two twin-set reversible stations (2004 and 2012) on Iberia's largest reservoir, pumping against the Pedrógão pool of the Guadiana
operatingItaly
Anapo
Anapo
Generating capacity500 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Sicily's big storage plant, in caverns beside the Anapo gorge above Syracuse
operatingPoland
Porąbka-Żar
Soła
Generating capacity500 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1979
Project notes
Upper basin carved into the summit of Mt Żar, lower pool on the Soła cascade
operatingItaly
San Giacomo (Vomano)
Vomano
Generating capacity490 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Mixed pumped stage between the Campotosto and Provvidenza reservoirs under the Gran Sasso
operatingAustria
Limberg II
Kapruner Ache
Generating capacity480 MW
- Stored energy
- Not published
- Hydraulic head
- 346 m
- Commissioned
- 2012
Project notes
Reversible cavern sets between the Mooserboden and Wasserfallboden reservoirs above Kaprun
operatingAustria
Limberg III
Kapruner Ache
Generating capacity480 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 2025
Project notes
Opened September 2025 on the same reservoir pair as Limberg II; both motor-generators failed within weeks, with repaired sets due back in September and December 2026
operatingCzechia
Dalešice
Jihlava
Generating capacity480 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1978
Project notes
Four reversible sets between the Dalešice and Mohelno reservoirs; the same Jihlava pool cools the Dukovany nuclear plant
operatingFrance
Le Cheylas
Isère
Generating capacity480 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1979
Project notes
Two 240 MW reversible sets between the Flumet basin and the Isère's Grésivaudan valley
operatingGermany
Waldeck II
Eder
Generating capacity480 MW
- Stored energy
- 3.43 GWh
- Hydraulic head
- Not published
- Commissioned
- 1974
Project notes
Two 240 MW cavern sets beside Waldeck I, pumping from the Eder's Affoldern pool
operatingSwitzerland
Hongrin-Léman (Veytaux)
Closed-loop / lake system
Generating capacity480 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1971
Project notes
Pumps Lake Geneva water 880 m up to Lac de l'Hongrin; the 2016 Veytaux-2 cavern doubled it to 480 MW
operatingSpain
Estany Gento–Sallente
Flamisell
Generating capacity468 MW
- Stored energy
- Not published
- Hydraulic head
- 400 m
- Commissioned
- 1985
Project notes
Pure pumping plant in a cavern between the Sallente and Gento lakes of the Catalan Pyrenees
operatingAustria
Kops II
Ill
Generating capacity450 MW
- Stored energy
- Not published
- Hydraulic head
- 818 m
- Commissioned
- 2008
Project notes
Three Pelton sets with separate pumps (525 MW pumping) between the Kops reservoir and the Rifa basin at Partenen
operatingBosnia and Herzegovina
Čapljina
Trebišnjica
Generating capacity440 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1979
Project notes
Underground plant near the Neretva delta; the karstic Trebišnjica, half canal by now, is its upper pool
operatingUnited Kingdom
Cruachan
Closed-loop / lake system
Generating capacity440 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1965
Project notes
The original 'Hollow Mountain' under Ben Cruachan, pumping from Loch Awe; Drax shelved its 600 MW expansion in 2025
operatingAustria
Reißeck II
Closed-loop / lake system
Generating capacity430 MW
- Stored energy
- Not published
- Hydraulic head
- 595 m
- Commissioned
- 2015
Project notes
Links the Reißeck and Malta groups, cycling water between the Mühldorfer See and Gößkar reservoirs
operatingSpain
Aldeadávila II
Duero
Generating capacity421 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1986
Project notes
Two reversible sets inside the Duero canyon plant; the full Aldeadávila complex reaches 1,243 MW
operatingFrance
La Coche
Isère
Generating capacity384 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1976
Project notes
France's first high-head pumped storage, above the Isère at Aigueblanche; an extra Pelton unit joined the four reversible sets in 2019
operatingGreece
Thisavros
Nestos
Generating capacity384 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Greece's largest hydro plant, a reversible station on the Nestos gorge near the Bulgarian border
operatingItaly
Santa Massenza
Sarca
Generating capacity377 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Post-war cavern plant in Trentino that can pump back up to Lake Molveno
operatingSpain
Tajo de la Encantada
Guadalhorce
Generating capacity377 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1978
Project notes
Spain's south-coast store above the El Chorro gorge of the Guadalhorce
operatingBulgaria
Belmeken
Closed-loop / lake system
Generating capacity375 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Top stage of the Belmeken–Sestrimo–Chaira cascade in the Rila mountains; two of its five sets are reversible
operatingAustria
Häusling
Ziller
Generating capacity360 MW
- Stored energy
- Not published
- Hydraulic head
- 696 m
- Commissioned
- 1988
Project notes
Second Zillertal stage; pumps from the Ziller headwaters back up to the 186 m Zillergründl arch dam
operatingAustria
Obervermuntwerk II
Ill
Generating capacity360 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 2019
Project notes
Cavern plant between the Silvretta and Vermunt reservoirs at the Ill's source; 360 MW in both turbine and pump mode
operatingGermany
Säckingen
Rhine
Generating capacity360 MW
- Stored energy
- 2.06 GWh
- Hydraulic head
- Not published
- Commissioned
- 1967
Project notes
Cavern plant under the Eggberg with its basin on the Hotzenwald shoulder, tailing into the High Rhine
operatingSpain
Aguayo
Closed-loop / lake system
Generating capacity360 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1982
Project notes
Pumps from the Alsa reservoir in Cantabria's Besaya basin; Repsol has an expansion to ~1 GW on the books
operatingUnited Kingdom
Ffestiniog
Closed-loop / lake system
Generating capacity360 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1963
Project notes
Britain's first major pumped storage, between Llyn Stwlan and the Tan-y-Grisiau reservoir
operatingSwitzerland
Grimsel 2
Closed-loop / lake system
Generating capacity348 MW
- Stored energy
- Not published
- Hydraulic head
- 400 m
- Commissioned
- 1980
Project notes
KWO's cavern plant between the Oberaarsee and Grimselsee at the Aare headwaters; four ~87 MW sets, one converter-fed
operatingPortugal
Aguieira
Mondego
Generating capacity336 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1981
Project notes
Three reversible groups on the Mondego above Coimbra
operatingItaly
Bargi
Limentra
Generating capacity330 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1975
Project notes
Two sets on the Suviana reservoir in the Apennines; offline since a fatal April 2024 machine-hall explosion, with repairs still running
operatingGermany
Hohenwarte II
Saale
Generating capacity320 MW
- Stored energy
- 2.09 GWh
- Hydraulic head
- Not published
- Commissioned
- 1966
Project notes
Eight small sets on the Saale cascade's Hohenwarte reservoir — the GDR's flagship store
operatingGreece
Sfikia
Aliakmonas
Generating capacity315 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Three reversible sets on the middle Aliakmonas, regulating PPC's cascade below Mount Vermio
operatingSpain
Puente Bibey
Bibei
Generating capacity315 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Mixed plant of the Sil system with pumping capability, downstream of the Conso group
operatingUkraine
Tashlyk PSP
Southern Buh
Generating capacity302 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 2006
Project notes
Two of six planned 151 MW sets run beside the South Ukraine nuclear plant; unit 3 has crept forward for years
operatingSwitzerland
Sarganserland (Mapragg–Sarelli)
Tamina
Generating capacity300 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Two-stage Tamina scheme with pumping between the Gigerwald reservoir and the Mapragg basin
operatingUnited Kingdom
Foyers
Closed-loop / lake system
Generating capacity300 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1974
Project notes
Pumps from Loch Ness up the fault scarp to Loch Mhòr, reusing the site of the 1896 aluminium-works hydro
operatingSpain
Conso
Camba
Generating capacity298 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1970
Project notes
Core of the San Agustín–Conso group in the Bibei headwaters of Galicia's Sil system
operatingAustria
Rodund II
Ill
Generating capacity295 MW
- Stored energy
- Not published
- Hydraulic head
- 354 m
- Commissioned
- 1976
Project notes
Single large reversible set beside Rodund I; rebuilt after a 2009 machine fire
operatingIreland
Turlough Hill
Closed-loop / lake system
Generating capacity292 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1974
Project notes
Ireland's only pumped storage, between an artificial summit basin and the glacial Lough Nahanagan in the Wicklow mountains
operatingAustria
Kühtai
Closed-loop / lake system
Generating capacity289 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1981
Project notes
Pumping stage of TIWAG's Sellrain–Silz group, cycling the Finstertal and Längental reservoirs above the Inn
operatingCroatia
Velebit
Zrmanja
Generating capacity276 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1984
Project notes
Pumps from the Zrmanja up to the Opsenica basin on the Velebit karst plateau
operatingNorway
Aurland III
Closed-loop / lake system
Generating capacity270 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Reversible stage of the Aurland mountain cascade above the Sognefjord
operatingPortugal
Foz Tua
Douro
Generating capacity270 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 2017
Project notes
Dam on the lower Tua whose reversible sets pump against the Douro backwater
operatingSpain
Valdecañas
Tajo
Generating capacity249 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Three reversible sets at the Valdecañas dam on the middle Tajo
operatingItaly
Taloro
Taloro
Generating capacity240 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Sardinia's pumped storage, between the Cucchinadorza and Benzone reservoirs on the Taloro
operatingUkraine
Kyiv PSP
Dnieper
Generating capacity235.5 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1970
Project notes
The USSR's first big pumped storage (1970–72), on the shore of the Kyiv reservoir
operatingAustria
Roßhag
Zemm
Generating capacity231 MW
- Stored energy
- Not published
- Hydraulic head
- 630 m
- Commissioned
- 1972
Project notes
Zemm valley plant pumping against the Schlegeis reservoir in the Zillertal group
operatingAustria
Lünersee
Closed-loop / lake system
Generating capacity229 MW
- Stored energy
- Not published
- Hydraulic head
- 974 m
- Commissioned
- 1958
Project notes
Five sets between the Lünersee and the Latschau basin; illwerke's planned Lünerseewerk II would add 1,000 MW on the same lake
operatingGermany
Erzhausen
Leine
Generating capacity220 MW
- Stored energy
- 1.1 GWh
- Hydraulic head
- Not published
- Commissioned
- 1964
Project notes
Lower Saxony's only large PSH, with its basin on the Selter ridge above the Leine
operatingGermany
Witznau
Schlücht
Generating capacity220 MW
- Stored energy
- 0.63 GWh
- Hydraulic head
- Not published
- Commissioned
- 1943
Project notes
Middle stage of the Schluchsee cascade, on the Schlücht between the Häusern and Waldshut steps
operatingItaly
Fadalto
Closed-loop / lake system
Generating capacity220 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Mixed plant of the Piave–Santa Croce cascade, pumping between Lago Morto and Lago di Santa Croce
operatingSpain
Soutelo
Closed-loop / lake system
Generating capacity215 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Companion pumping plant to Conso in the Bibei headwaters
operatingSpain
Guillena
Rivera de Huelva
Generating capacity210 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1973
Project notes
Three reversible sets north of Seville — Andalusia's counterweight to the Pyrenean stores
operatingPortugal
Salamonde II
Cávado
Generating capacity207 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Single large reversible set in a cavern beside the 1953 Salamonde dam on the Cávado
operatingNorway
Duge
Sira
Generating capacity200 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1974
Project notes
Two reversible sets at the top of the Sira-Kvina system, between the Svartevatn and Gravatn reservoirs
operatingPoland
Solina
San
Generating capacity200 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1968
Project notes
Two of the four sets at Poland's tallest dam are reversible against the Myczkowce pool of the San; modernised 2003
operatingSpain
Bolarque II
Tajo
Generating capacity200 MW
- Stored energy
- Not published
- Hydraulic head
- 240 m
- Commissioned
- 1974
Project notes
Four reversible sets lift Tagus water 240 m to La Bujeda, the head pond of the Tagus–Segura transfer
operatingSpain
Moralets
Noguera Ribagorçana
Generating capacity200 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Pumps from the Baserca reservoir up to Llauset, under the Pyrenean main ridge
operatingAustria
Rodund I
Ill
Generating capacity198 MW
- Stored energy
- Not published
- Hydraulic head
- 354 m
- Commissioned
- 1952
Project notes
Workhorse of the Obere Ill–Lünersee group, between the Latschau basin and the Ill at Vandans
operatingSlovakia
Liptovská Mara
Váh
Generating capacity198 MW
- Stored energy
- Not published
- Hydraulic head
- 48 m
- Commissioned
- 1976
Project notes
Mixed plant on the Váh: two Kaplan sets work natural inflow, two reversible Dériaz sets pump from the Bešeňová pool
operatingPortugal
Frades I (Venda Nova II)
Cávado
Generating capacity191 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 2005
Project notes
First reversible extension of the Venda Nova scheme, from the Rabagão reservoir down to Salamonde
under constructionAustria
Kühtai 2
Closed-loop / lake system
Generating capacity190 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Two 95 MW pump-turbines and a new Kühtai reservoir; test operation began August 2026, regular service planned late 2027
operatingPortugal
Baixo Sabor
Sabor
Generating capacity190 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 2016
Project notes
Two-step reversible scheme on the Sabor, the Douro's last wild tributary before it was dammed
operatingSlovenia
Avče
Soča
Generating capacity185 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 2010
Project notes
Slovenia's only pumped storage, a variable-speed set above the Soča at Avče
operatingSwitzerland
Ferrera
Hinterrhein
Generating capacity180 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1962
Project notes
Kraftwerke Hinterrhein's pumping stage between the Valle di Lei reservoir and the Sufers pool on the Hinterrhein
under constructionAustria
Ebensee
Traun
Generating capacity170 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Energie AG shaft plant pumping out of the Traunsee; completion planned for 2027
under constructionAustria
Tauernmoos
Closed-loop / lake system
Generating capacity170 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
ÖBB's 16.7 Hz railway plant between the Weißsee and Tauernmoossee in the Stubach valley; misfabricated turbine spirals pushed commissioning to summer 2028
operatingSwitzerland
Robiei
Bavona
Generating capacity165 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1968
Project notes
Ofima's pumping hub in the Maggia system, cycling water between the Robiei and San Carlo basins in Val Bavona
operatingAustria
Limberg I
Kapruner Ache
Generating capacity160 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
The 1950s Kaprun Oberstufe between Mooserboden and Wasserfallboden; its generators are under repair through 2026 alongside Limberg III's
under constructionGermany
Happurg
Closed-loop / lake system
Generating capacity160 MW
- Stored energy
- 0.9 GWh
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Offline since 2011 when the upper basin floor failed; Uniper is rebuilding it for a return around 2028
operatingGermany
Langenprozelten
Sinn
Generating capacity160 MW
- Stored energy
- 0.95 GWh
- Hydraulic head
- Not published
- Commissioned
- 1976
Project notes
Runs on the 16.7 Hz railway grid for DB Energie, above the Sinn in the Spessart
operatingPoland
Żydowo
Radew
Generating capacity157 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1971
Project notes
Early lake-to-lake plant between Kamienne and Kwiecko lakes in Pomerania
operatingGermany
Herdecke
Ruhr
Generating capacity153 MW
- Stored energy
- 0.59 GWh
- Hydraulic head
- Not published
- Commissioned
- 1989
Project notes
Replaced Arthur Koepchen's landmark 1930 machine hall on the Hengstey lake of the Ruhr
operatingGermany
Waldshut
Rhine
Generating capacity150 MW
- Stored energy
- 0.4 GWh
- Hydraulic head
- Not published
- Commissioned
- 1951
Project notes
Bottom stage of the Schluchsee cascade, pumping straight out of the High Rhine
operatingItaly
Pont Ventoux-Susa
Dora Riparia
Generating capacity150 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
High-head Susa valley scheme with pumping between Val Clarea basins on the Dora Riparia
operatingPortugal
Torrão
Douro
Generating capacity146 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1988
Project notes
Reversible plant at the Tâmega mouth, pumping from the Douro's Crestuma pool
operatingBelgium
Plate-Taille
Eau d'Heure
Generating capacity144 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1981
Project notes
Sits on Belgium's largest artificial lakes, built to compensate Sambre water taken for cooling
operatingAustria
Feldsee
Closed-loop / lake system
Generating capacity140 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 2009
Project notes
Kelag's two-set plant in the Fragant group of the Möll basin, between the Feldsee and the Wurten reservoir
operatingGermany
Rönkhausen
Glinge
Generating capacity140 MW
- Stored energy
- 0.74 GWh
- Hydraulic head
- Not published
- Commissioned
- 1969
Project notes
Twin basins above the Lenne valley at Finnentrop, on the little Glinge stream
operatingGermany
Waldeck I
Eder
Generating capacity140 MW
- Stored energy
- 0.48 GWh
- Hydraulic head
- Not published
- Commissioned
- 1933
Project notes
The 1930s pioneer above the Edersee, gutted and rebuilt with modern sets in 2010
operatingItaly
Gargnano (San Giacomo)
Closed-loop / lake system
Generating capacity137 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1959
Project notes
Pumps between Lake Valvestino and Lake Garda from a shoreline hall on the west bank
operatingSpain
Torrejón
Tajo
Generating capacity132 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Mixed plant pumping between the twin Torrejón pools on the Tajo and the Tiétar
operatingPortugal
Vilarinho das Furnas
Cávado
Generating capacity125 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1972
Project notes
Draws down the Homem valley reservoir — famous for the drowned village it covers — and pumps back from Salamonde
operatingSpain
Tanes
Nalón
Generating capacity123 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Reversible sets between the Tanes and Rioseco reservoirs on the upper Nalón in Asturias
operatingSwitzerland
Etzelwerk
Closed-loop / lake system
Generating capacity121 MW
- Stored energy
- Not published
- Hydraulic head
- 473 m
- Commissioned
- 1937
Project notes
SBB's 16.7 Hz railway plant between the Sihlsee and Lake Zurich at Altendorf
operatingAustria
Malta Oberstufe
Malta
Generating capacity120 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- Not yet / unknown
Project notes
Two sets at Galgenbichl lift Malta water up to Kölnbrein; rebuilt for variable-speed operation 2019–2024
operatingGermany
Geesthacht
Elbe
Generating capacity120 MW
- Stored energy
- 0.6 GWh
- Hydraulic head
- Not published
- Commissioned
- 1958
Project notes
Vattenfall's circular basin on the Geest bluff, pumping straight out of the tidal Elbe
operatingItaly
Capriati
Volturno
Generating capacity113 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1963
Project notes
Pumps between Lake Matese, high on the massif, and the Volturno valley
operatingGermany
Häusern
Schwarza
Generating capacity100 MW
- Stored energy
- 0.46 GWh
- Hydraulic head
- Not published
- Commissioned
- 1931
Project notes
Top stage of the Schluchsee cascade, working the Black Forest's Schluchsee against the Schwarza basin
operatingSlovakia
Ružín
Hornád
Generating capacity60 MW
- Stored energy
- Not published
- Hydraulic head
- 52.7 m
- Commissioned
- 1973
Project notes
Slovakia's first reversible-turbine plant, between the Ružín and Ružín II pools of the Hornád above Košice
operatingCzechia
Štěchovice II
Vltava
Generating capacity45 MW
- Stored energy
- Not published
- Hydraulic head
- 219.5 m
- Commissioned
- 1947
Project notes
Upper basin on Homole hill above the Vltava cascade; rebuilt with a single 45 MW reversible set in 1996
operatingSlovakia
Dobšiná
Closed-loop / lake system
Generating capacity24 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1953
Project notes
Transfers Hnilec water from Palcmanská Maša across the ridge into the Slaná basin — a 1953 inter-basin plant
operatingSlovakia
Mikšová II
Váh
Generating capacity2.6 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1963
Project notes
The 1963 experimental unit where the reversible turbines for Ružín and Liptovská Mara were proven
operatingCzechia
Černé jezero
Úhlava
Generating capacity1.9 MW
- Stored energy
- Not published
- Hydraulic head
- Not published
- Commissioned
- 1930
Project notes
The first pumped-storage plant in Czechia (1930), between the glacial Černé jezero and a small basin on the Úhlava