Grand'Maison
Eau d'Olle
- Uzkrātā enerģija
- 34.8 GWh
- Hidrauliskā galvas
- Not published
- Nodots ekspluatācijā
- 1985
Projekta piezīmes
Europe's largest pumped-storage plant; twelve sets split between a surface and an underground powerhouse on the Eau d'Olle
24 countries · operating + construction + announced
Feeds liveEurope’s pumped-storage fleet in one expandable directory: generating power, stored energy where published, hydraulic head, river context and project status.
Eau d'Olle
Europe's largest pumped-storage plant; twelve sets split between a surface and an underground powerhouse on the Eau d'Olle
Slēgtās cilpas / ezeru sistēmas
Europe's fastest-responding big store, inside Elidir mountain between Marchlyn Mawr and Llyn Peris
Júcar
La Muela I (1989) and II (2013) share a plateau basin 500 m above the Cortes reservoir - Europe's largest pumping complex on one site
Slēgtās cilpas / ezeru sistēmas
SSE's Great Glen scheme above Loch Lochy - the UK's first new large PSH in 40 years; FID hinges on the 2026 cap-and-floor award
Our
SEO's eleven-set plant on the Our; the 200 MW eleventh machine arrived in 2015
Dniester
Four of seven planned 324 MW sets run; the 2,268 MW build-out, due around 2028, would make it Europe's largest
Gesso
Italy's largest hydro plant: the Chiotas (1,064 MW) and Rovina sections share the Piastra lower reservoir on the Gesso
Amblève
Engie's three-basin plant above the Amblève pie Coo, uprated past 1.1 GW in the 2020s
Schwarza
Germany's largest PSH and Europe's first big plant with variable-speed sets, on the Thuringian Schwarza
Große Mittweida
Six 175 MW sets in the Erzgebirge above the Große Mittweida; Germany's second-largest store
Volturno
Four 250 MW sets between the Cesima hill basin and the Volturno plain north of Naples
Slēgtās cilpas / ezeru sistēmas
Pumps from Lake Maggiore 740 m up to Lago Delio; the hall in the cliff holds eight sets
Someșul Cald
Studied since the 1980s above the Tarnița reservoir near Cluj; still lacks financing and a start date
Linth
Axpo's cavern plant lifts Limmernsee water 630 m to the dammed Muttsee, 2,474 m up - Europe's highest big reservoir
Dnieper
Soviet-era project on the Kaniv reservoir repeatedly restarted by Ukrhydroenergo; construction remains suspended
Oglio
Eight sets on the Oglio pie Edolo fed from Lago d'Avio; commonly rounded to a gigawatt
Truyère
Four 227 MW sets underground on the Truyère; EDF's second-largest storage plant
Wehra
The Hornberg basin sits 600 m above the Wehra valley - the biggest machine in the Black Forest group
Nemunas
Four 225 MW sets against the Kaunas reservoir on the Nemunas, built to firm the Baltic grid, with room for a fifth unit
Slēgtās cilpas / ezeru sistēmas
Six variable-speed sets between the Emosson and Vieux Emosson lakes above the Rhône's Trient gorge; 20 GWh of storage
Tâmega
Pure pumping plant of Iberdrola's Tâmega 'giga-battery', working against the Daivões reservoir
Slēgtās cilpas / ezeru sistēmas
The Balkans' largest PSH, below the Belmeken reservoir; offline after a March 2022 turbine failure, with unit 2 back pie 210 MW in May 2025 and two more sets due through 2026
Tormes
Six sets 400 m underground pump the vast Almendra reservoir on the Tormes against the Duero canyon
Meuse
Upper basin on the plateau above the Meuse loop at Revin - lowland France's counterpart to the Alpine stores
Arc
Bissorte's reversible extension in the Maurienne, working the 1930s Bissorte dam against the Arc valley floor
Cávado
Two 368 MW variable-speed sets - among Europe's largest such machines - on the same Rabagão-Cávado drop as Frades I
Čierny Váh
The largest power station in Slovakia of any kind; upper basin dug into the ridge above the Čierny Váh valley
Möll
Europe's highest-head pumped storage; the Rottau powerhouse in the Möll valley works 1,106 m below the Kölnbrein reservoir
Piaśnica
Poland's largest PSH, on glacial Lake Żarnowiec - built to partner a nuclear plant that was never finished
Acheloos
Terna's twin upper basins (Agios Georgios 460 MW, Pyrgos 220 MW) share the Kastraki reservoir on the Acheloos; first units due 2027
Divoká Desná
Largest hydro plant in Czechia; twin 325 MW Francis sets under Mravenečník, with the upper basin dug into the Dlouhé stráně summit
Slēgtās cilpas / ezeru sistēmas
Norway's largest pumped-storage plant; two of its four sets are reversible, cycling Blåsjø water in the Ulla-Førre scheme
Drina
Two 307 MW sets pump 600 m up from the Perućac reservoir on the Drina to Lake Zaovine on Tara mountain
Oglio
Italy's highest head - 1,404 m from Lago d'Arno down to the Oglio pie Sellero
Guadiana
Two twin-set reversible stations (2004 and 2012) on Iberia's largest reservoir, pumping against the Pedrógão pool of the Guadiana
Anapo
Sicily's big storage plant, in caverns beside the Anapo gorge above Syracuse
Soła
Upper basin carved into the summit of Mt Żar, lower pool on the Soła cascade
Vomano
Mixed pumped stage between the Campotosto and Provvidenza reservoirs under the Gran Sasso
Kapruner Ache
Reversible cavern sets between the Mooserboden and Wasserfallboden reservoirs above Kaprun
Kapruner Ache
Opened September 2025 on the same reservoir pair as Limberg II; both motor-generators failed within weeks, with repaired sets due back in September and December 2026
Jihlava
Four reversible sets between the Dalešice and Mohelno reservoirs; the same Jihlava pool cools the Dukovany nuclear plant
Isère
Two 240 MW reversible sets between the Flumet basin and the Isère's Grésivaudan valley
Eder
Two 240 MW cavern sets beside Waldeck I, pumping from the Eder's Affoldern pool
Slēgtās cilpas / ezeru sistēmas
Pumps Lake Geneva water 880 m up to Lac de l'Hongrin; the 2016 Veytaux-2 cavern doubled it to 480 MW
Flamisell
Pure pumping plant in a cavern between the Sallente and Gento lakes of the Catalan Pyrenees
Ill
Three Pelton sets with separate pumps (525 MW pumping) between the Kops reservoir and the Rifa basin pie Partenen
Trebišnjica
Underground plant near the Neretva delta; the karstic Trebišnjica, half canal by now, is its upper pool
Slēgtās cilpas / ezeru sistēmas
The original 'Hollow Mountain' under Ben Cruachan, pumping from Loch Awe; Drax shelved its 600 MW expansion in 2025
Slēgtās cilpas / ezeru sistēmas
Links the Reißeck and Malta groups, cycling water between the Mühldorfer See and Gößkar reservoirs
Duero
Two reversible sets inside the Duero canyon plant; the full Aldeadávila complex reaches 1,243 MW
Isère
France's first high-head pumped storage, above the Isère pie Aigueblanche; an extra Pelton unit joined the four reversible sets in 2019
Nestos
Greece's largest hydro plant, a reversible station on the Nestos gorge near the Bulgarian border
Sarca
Post-war cavern plant in Trentino that can pump back up to Lake Molveno
Guadalhorce
Spain's south-coast store above the El Chorro gorge of the Guadalhorce
Slēgtās cilpas / ezeru sistēmas
Top stage of the Belmeken-Sestrimo-Chaira cascade in the Rila mountains; two of its five sets are reversible
Ziller
Second Zillertal stage; pumps from the Ziller headwaters back up to the 186 m Zillergründl arch dam
Ill
Cavern plant between the Silvretta and Vermunt reservoirs pie the Ill's source; 360 MW in both turbine and pump mode
Rhine
Cavern plant under the Eggberg with its basin on the Hotzenwald shoulder, tailing into the High Rhine
Slēgtās cilpas / ezeru sistēmas
Pumps from the Alsa reservoir in Cantabria's Besaya basin; Repsol has an expansion to ~1 GW on the books
Slēgtās cilpas / ezeru sistēmas
Britain's first major pumped storage, between Llyn Stwlan and the Tan-y-Grisiau reservoir
Slēgtās cilpas / ezeru sistēmas
KWO's cavern plant between the Oberaarsee and Grimselsee pie the Aare headwaters; four ~87 MW sets, one converter-fed
Mondego
Three reversible groups on the Mondego above Coimbra
Limentra
Two sets on the Suviana reservoir in the Apennines; offline since a fatal April 2024 machine-hall explosion, with repairs still running
Saale
Eight small sets on the Saale cascade's Hohenwarte reservoir - the GDR's flagship store
Aliakmonas
Three reversible sets on the middle Aliakmonas, regulating PPC's cascade below Mount Vermio
Bibei
Mixed plant of the Sil system with pumping capability, downstream of the Conso group
Southern Buh
Two of six planned 151 MW sets run beside the South Ukraine nuclear plant; unit 3 has crept forward for years
Tamina
Two-stage Tamina scheme with pumping between the Gigerwald reservoir and the Mapragg basin
Slēgtās cilpas / ezeru sistēmas
Pumps from Loch Ness up the fault scarp to Loch Mhòr, reusing the site of the 1896 aluminium-works hydro
Camba
Core of the San Agustín-Conso group in the Bibei headwaters of Galicia's Sil sistēmas
Ill
Single large reversible set beside Rodund I; rebuilt after a 2009 machine fire
Slēgtās cilpas / ezeru sistēmas
Ireland's only pumped storage, between an artificial summit basin and the glacial Lough Nahanagan in the Wicklow mountains
Slēgtās cilpas / ezeru sistēmas
Pumping stage of TIWAG's Sellrain-Silz group, cycling the Finstertal and Längental reservoirs above the Inn
Zrmanja
Pumps from the Zrmanja up to the Opsenica basin on the Velebit karst plateau
Slēgtās cilpas / ezeru sistēmas
Reversible stage of the Aurland mountain cascade above the Sognefjord
Douro
Dam on the lower Tua whose reversible sets pump against the Douro backwater
Tajo
Three reversible sets pie the Valdecañas dam on the middle Tajo
Taloro
Sardinia's pumped storage, between the Cucchinadorza and Benzone reservoirs on the Taloro
Dnieper
The USSR's first big pumped storage (1970-72), on the shore of the Kyiv reservoir
Zemm
Zemm valley plant pumping against the Schlegeis reservoir in the Zillertal group
Slēgtās cilpas / ezeru sistēmas
Five sets between the Lünersee and the Latschau basin; illwerke's planned Lünerseewerk II would add 1,000 MW on the same lake
Leine
Lower Saxony's only large PSH, with its basin on the Selter ridge above the Leine
Schlücht
Middle stage of the Schluchsee cascade, on the Schlücht between the Häusern and Waldshut steps
Slēgtās cilpas / ezeru sistēmas
Mixed plant of the Piave-Santa Croce cascade, pumping between Lago Morto and Lago di Santa Croce
Slēgtās cilpas / ezeru sistēmas
Companion pumping plant to Conso in the Bibei headwaters
Rivera de Huelva
Three reversible sets north of Seville - Andalusia's counterweight to the Pyrenean stores
Cávado
Single large reversible set in a cavern beside the 1953 Salamonde dam on the Cávado
Sira
Two reversible sets pie the top of the Sira-Kvina system, between the Svartevatn and Gravatn reservoirs
San
Two of the four sets pie Poland's tallest dam are reversible against the Myczkowce pool of the San; modernised 2003
Tajo
Four reversible sets lift Tagus water 240 m to La Bujeda, the head pond of the Tagus-Segura transfer
Noguera Ribagorçana
Pumps from the Baserca reservoir up to Llauset, under the Pyrenean main ridge
Ill
Workhorse of the Obere Ill-Lünersee group, between the Latschau basin and the Ill pie Vandans
Váh
Mixed plant on the Váh: two Kaplan sets work natural inflow, two reversible Dériaz sets pump from the Bešeňová pool
Cávado
First reversible extension of the Venda Nova scheme, from the Rabagão reservoir down to Salamonde
Slēgtās cilpas / ezeru sistēmas
Two 95 MW pump-turbines and a new Kühtai reservoir; test operation began August 2026, regular service planned late 2027
Sabor
Two-step reversible scheme on the Sabor, the Douro's last wild tributary before it was dammed
Soča
Slovenia's only pumped storage, a variable-speed set above the Soča pie Avče
Hinterrhein
Kraftwerke Hinterrhein's pumping stage between the Valle di Lei reservoir and the Sufers pool on the Hinterrhein
Traun
Energie AG shaft plant pumping out of the Traunsee; completion planned for 2027
Slēgtās cilpas / ezeru sistēmas
ÖBB's 16.7 Hz railway plant between the Weißsee and Tauernmoossee in the Stubach valley; misfabricated turbine spirals pushed commissioning to summer 2028
Bavona
Ofima's pumping hub in the Maggia system, cycling water between the Robiei and San Carlo basins in Val Bavona
Kapruner Ache
The 1950s Kaprun Oberstufe between Mooserboden and Wasserfallboden; its generators are under repair through 2026 alongside Limberg III's
Slēgtās cilpas / ezeru sistēmas
Offline since 2011 when the upper basin floor failed; Uniper is rebuilding it for a return around 2028
Sinn
Runs on the 16.7 Hz railway grid for DB Energie, above the Sinn in the Spessart
Radew
Early lake-to-lake plant between Kamienne and Kwiecko lakes in Pomerania
Ruhr
Replaced Arthur Koepchen's landmark 1930 machine hall on the Hengstey lake of the Ruhr
Rhine
Bottom stage of the Schluchsee cascade, pumping straight out of the High Rhine
Dora Riparia
High-head Susa valley scheme with pumping between Val Clarea basins on the Dora Riparia
Douro
Reversible plant pie the Tâmega mouth, pumping from the Douro's Crestuma pool
Eau d'Heure
Sits on Belgium's largest artificial lakes, built to compensate Sambre water taken for cooling
Slēgtās cilpas / ezeru sistēmas
Kelag's two-set plant in the Fragant group of the Möll basin, between the Feldsee and the Wurten reservoir
Glinge
Twin basins above the Lenne valley pie Finnentrop, on the little Glinge stream
Eder
The 1930s pioneer above the Edersee, gutted and rebuilt with modern sets in 2010
Slēgtās cilpas / ezeru sistēmas
Pumps between Lake Valvestino and Lake Garda from a shoreline hall on the west bank
Tajo
Mixed plant pumping between the twin Torrejón pools on the Tajo and the Tiétar
Cávado
Draws down the Homem valley reservoir - famous for the drowned village it covers - and pumps back from Salamonde
Nalón
Reversible sets between the Tanes and Rioseco reservoirs on the upper Nalón in Asturias
Slēgtās cilpas / ezeru sistēmas
SBB's 16.7 Hz railway plant between the Sihlsee and Lake Zurich pie Altendorf
Malta
Two sets pie Galgenbichl lift Malta water up to Kölnbrein; rebuilt for variable-speed operation 2019-2024
Elbe
Vattenfall's circular basin on the Geest bluff, pumping straight out of the tidal Elbe
Volturno
Pumps between Lake Matese, high on the massif, and the Volturno valley
Schwarza
Top stage of the Schluchsee cascade, working the Black Forest's Schluchsee against the Schwarza basin
Hornád
Slovakia's first reversible-turbine plant, between the Ružín and Ružín II pools of the Hornád above Košice
Vltava
Upper basin on Homole hill above the Vltava cascade; rebuilt with a single 45 MW reversible set in 1996
Slēgtās cilpas / ezeru sistēmas
Transfers Hnilec water from Palcmanská Maša across the ridge into the Slaná basin - a 1953 inter-basin plant
Váh
The 1963 experimental unit where the reversible turbines for Ružín and Liptovská Mara were proven
Úhlava
The first pumped-storage plant in Czechia (1930), between the glacial Černé jezero and a small basin on the Úhlava