127 pumped-storage plants

24 countries · operating + construction + announced

72 of 72 rivers scored
Powered byTERRA 2100
RiverData.org · infrastructure intelligence

Hydrostorage

Europe’s pumped-storage fleet in one expandable directory: generating power, stored energy where published, hydraulic head, river context and project status.

Pumped storage
127plants & projects
24countries
53 GWoperating capacity
209 GWhpublished storage
127 shown
Grand'MaisonFrance1,800 MWgenerating capacityEau d'OlleoperatingDetails
Storage
34.8 GWh
Hydraulic head
Not published
Commissioned
1985
Stage
operating

Europe's largest pumped-storage plant; twelve sets split between a surface and an underground powerhouse on the Eau d'Olle

DinorwigUnited Kingdom1,728 MWgenerating capacityClosed-loop / lake systemoperatingDetails
Storage
9.1 GWh
Hydraulic head
Not published
Commissioned
1984
Stage
operating

Europe's fastest-responding big store, inside Elidir mountain between Marchlyn Mawr and Llyn Peris

La Muela (Cortes-La Muela)Spain1,490 MWgenerating capacityJúcaroperatingDetails
Storage
24.5 GWh
Hydraulic head
Not published
Commissioned
1989
Stage
operating

La Muela I (1989) and II (2013) share a plateau basin 500 m above the Cortes reservoir — Europe's largest pumping complex on one site

Coire GlasUnited Kingdom1,300 MWgenerating capacityClosed-loop / lake systemannouncedDetails
Storage
30 GWh
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
announced

SSE's Great Glen scheme above Loch Lochy — the UK's first new large PSH in 40 years; FID hinges on the 2026 cap-and-floor award

ViandenLuxembourg1,296 MWgenerating capacityOuroperatingDetails
Storage
4.92 GWh
Hydraulic head
Not published
Commissioned
1964
Stage
operating

SEO's eleven-set plant on the Our; the 200 MW eleventh machine arrived in 2015

Dniester PSPUkraine1,296 MWgenerating capacityDniesteroperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
2009
Stage
operating

Four of seven planned 324 MW sets run; the 2,268 MW build-out, due around 2028, would make it Europe's largest

Entracque (Luigi Einaudi)Italy1,184 MWgenerating capacityGessooperatingDetails
Storage
17.04 GWh
Hydraulic head
Not published
Commissioned
1982
Stage
operating

Italy's largest hydro plant: the Chiotas (1,064 MW) and Rovina sections share the Piastra lower reservoir on the Gesso

Coo-Trois-PontsBelgium1,164 MWgenerating capacityAmblèveoperatingDetails
Storage
5.82 GWh
Hydraulic head
Not published
Commissioned
1971
Stage
operating

Engie's three-basin plant above the Amblève at Coo, uprated past 1.1 GW in the 2020s

GoldisthalGermany1,060 MWgenerating capacitySchwarzaoperatingDetails
Storage
8.48 GWh
Hydraulic head
Not published
Commissioned
2003
Stage
operating

Germany's largest PSH and Europe's first big plant with variable-speed sets, on the Thuringian Schwarza

MarkersbachGermany1,045 MWgenerating capacityGroße MittweidaoperatingDetails
Storage
4.02 GWh
Hydraulic head
Not published
Commissioned
1979
Stage
operating

Six 175 MW sets in the Erzgebirge above the Große Mittweida; Germany's second-largest store

PresenzanoItaly1,000 MWgenerating capacityVolturnooperatingDetails
Storage
7 GWh
Hydraulic head
Not published
Commissioned
1991
Stage
operating

Four 250 MW sets between the Cesima hill basin and the Volturno plain north of Naples

RoncovalgrandeItaly1,000 MWgenerating capacityClosed-loop / lake systemoperatingDetails
Storage
17.68 GWh
Hydraulic head
Not published
Commissioned
1971
Stage
operating

Pumps from Lake Maggiore 740 m up to Lago Delio; the hall in the cliff holds eight sets

Tarnița–LăpușteștiRomania1,000 MWgenerating capacitySomeșul CaldannouncedDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
announced

Studied since the 1980s above the Tarnița reservoir near Cluj; still lacks financing and a start date

Limmern (Linth-Limmern)Switzerland1,000 MWgenerating capacityLinthoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
2016
Stage
operating

Axpo's cavern plant lifts Limmernsee water 630 m to the dammed Muttsee, 2,474 m up — Europe's highest big reservoir

Kaniv PSPUkraine1,000 MWgenerating capacityDnieperannouncedDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
announced

Soviet-era project on the Kaniv reservoir repeatedly restarted by Ukrhydroenergo; construction remains suspended

EdoloItaly977.5 MWgenerating capacityOgliooperatingDetails
Storage
4.89 GWh
Hydraulic head
Not published
Commissioned
1985
Stage
operating

Eight sets on the Oglio at Edolo fed from Lago d'Avio; commonly rounded to a gigawatt

MontézicFrance910 MWgenerating capacityTruyèreoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1982
Stage
operating

Four 227 MW sets underground on the Truyère; EDF's second-largest storage plant

WehrGermany910 MWgenerating capacityWehraoperatingDetails
Storage
6.07 GWh
Hydraulic head
600 m
Commissioned
1975
Stage
operating

The Hornberg basin sits 600 m above the Wehra valley — the biggest machine in the Black Forest group

KruonisLithuania900 MWgenerating capacityNemunasoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1992
Stage
operating

Four 225 MW sets against the Kaunas reservoir on the Nemunas, built to firm the Baltic grid, with room for a fifth unit

Nant de DranceSwitzerland900 MWgenerating capacityClosed-loop / lake systemoperatingDetails
Storage
20 GWh
Hydraulic head
Not published
Commissioned
2022
Stage
operating

Six variable-speed sets between the Emosson and Vieux Emosson lakes above the Rhône's Trient gorge; 20 GWh of storage

GouvãesPortugal880 MWgenerating capacityTâmegaoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
2022
Stage
operating

Pure pumping plant of Iberdrola's Tâmega 'giga-battery', working against the Daivões reservoir

ChairaBulgaria864 MWgenerating capacityClosed-loop / lake systemoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1993
Stage
operating

The Balkans' largest PSH, below the Belmeken reservoir; offline after a March 2022 turbine failure, with unit 2 back at 210 MW in May 2025 and two more sets due through 2026

VillarinoSpain857 MWgenerating capacityTormesoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1970
Stage
operating

Six sets 400 m underground pump the vast Almendra reservoir on the Tormes against the Duero canyon

RevinFrance808 MWgenerating capacityMeuseoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1976
Stage
operating

Upper basin on the plateau above the Meuse loop at Revin — lowland France's counterpart to the Alpine stores

Super BissorteFrance742 MWgenerating capacityArcoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
operating

Bissorte's reversible extension in the Maurienne, working the 1930s Bissorte dam against the Arc valley floor

Frades II (Venda Nova III)Portugal736 MWgenerating capacityCávadooperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
2017
Stage
operating

Two 368 MW variable-speed sets — among Europe's largest such machines — on the same Rabagão–Cávado drop as Frades I

Čierny VáhSlovakia735.16 MWgenerating capacityČierny VáhoperatingDetails
Storage
Not published
Hydraulic head
434 m
Commissioned
1981
Stage
operating

The largest power station in Slovakia of any kind; upper basin dug into the ridge above the Čierny Váh valley

Malta-HauptstufeAustria730 MWgenerating capacityMölloperatingDetails
Storage
Not published
Hydraulic head
1,106 m
Commissioned
1979
Stage
operating

Europe's highest-head pumped storage; the Rottau powerhouse in the Möll valley works 1,106 m below the Kölnbrein reservoir

ŻarnowiecPoland716 MWgenerating capacityPiaśnicaoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1983
Stage
operating

Poland's largest PSH, on glacial Lake Żarnowiec — built to partner a nuclear plant that was never finished

AmfilochiaGreece680 MWgenerating capacityAcheloosunder constructionDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
under construction

Terna's twin upper basins (Agios Georgios 460 MW, Pyrgos 220 MW) share the Kastraki reservoir on the Acheloos; first units due 2027

Dlouhé stráněCzechia650 MWgenerating capacityDivoká DesnáoperatingDetails
Storage
Not published
Hydraulic head
510.7 m
Commissioned
1996
Stage
operating

Largest hydro plant in Czechia; twin 325 MW Francis sets under Mravenečník, with the upper basin dug into the Dlouhé stráně summit

SaurdalNorway640 MWgenerating capacityClosed-loop / lake systemoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
operating

Norway's largest pumped-storage plant; two of its four sets are reversible, cycling Blåsjø water in the Ulla-Førre scheme

Bajina BaštaSerbia614 MWgenerating capacityDrinaoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1982
Stage
operating

Two 307 MW sets pump 600 m up from the Perućac reservoir on the Drina to Lake Zaovine on Tara mountain

San FioranoItaly568 MWgenerating capacityOgliooperatingDetails
Storage
Not published
Hydraulic head
1,404 m
Commissioned
1973
Stage
operating

Italy's highest head — 1,404 m from Lago d'Arno down to the Oglio at Sellero

AlquevaPortugal518 MWgenerating capacityGuadianaoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
2004
Stage
operating

Two twin-set reversible stations (2004 and 2012) on Iberia's largest reservoir, pumping against the Pedrógão pool of the Guadiana

AnapoItaly500 MWgenerating capacityAnapooperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
operating

Sicily's big storage plant, in caverns beside the Anapo gorge above Syracuse

Porąbka-ŻarPoland500 MWgenerating capacitySołaoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1979
Stage
operating

Upper basin carved into the summit of Mt Żar, lower pool on the Soła cascade

San Giacomo (Vomano)Italy490 MWgenerating capacityVomanooperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
operating

Mixed pumped stage between the Campotosto and Provvidenza reservoirs under the Gran Sasso

Limberg IIAustria480 MWgenerating capacityKapruner AcheoperatingDetails
Storage
Not published
Hydraulic head
346 m
Commissioned
2012
Stage
operating

Reversible cavern sets between the Mooserboden and Wasserfallboden reservoirs above Kaprun

Limberg IIIAustria480 MWgenerating capacityKapruner AcheoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
2025
Stage
operating

Opened September 2025 on the same reservoir pair as Limberg II; both motor-generators failed within weeks, with repaired sets due back in September and December 2026

DalešiceCzechia480 MWgenerating capacityJihlavaoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1978
Stage
operating

Four reversible sets between the Dalešice and Mohelno reservoirs; the same Jihlava pool cools the Dukovany nuclear plant

Le CheylasFrance480 MWgenerating capacityIsèreoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1979
Stage
operating

Two 240 MW reversible sets between the Flumet basin and the Isère's Grésivaudan valley

Waldeck IIGermany480 MWgenerating capacityEderoperatingDetails
Storage
3.43 GWh
Hydraulic head
Not published
Commissioned
1974
Stage
operating

Two 240 MW cavern sets beside Waldeck I, pumping from the Eder's Affoldern pool

Hongrin-Léman (Veytaux)Switzerland480 MWgenerating capacityClosed-loop / lake systemoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1971
Stage
operating

Pumps Lake Geneva water 880 m up to Lac de l'Hongrin; the 2016 Veytaux-2 cavern doubled it to 480 MW

Estany Gento–SallenteSpain468 MWgenerating capacityFlamiselloperatingDetails
Storage
Not published
Hydraulic head
400 m
Commissioned
1985
Stage
operating

Pure pumping plant in a cavern between the Sallente and Gento lakes of the Catalan Pyrenees

Kops IIAustria450 MWgenerating capacityIlloperatingDetails
Storage
Not published
Hydraulic head
818 m
Commissioned
2008
Stage
operating

Three Pelton sets with separate pumps (525 MW pumping) between the Kops reservoir and the Rifa basin at Partenen

ČapljinaBosnia and Herzegovina440 MWgenerating capacityTrebišnjicaoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1979
Stage
operating

Underground plant near the Neretva delta; the karstic Trebišnjica, half canal by now, is its upper pool

CruachanUnited Kingdom440 MWgenerating capacityClosed-loop / lake systemoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1965
Stage
operating

The original 'Hollow Mountain' under Ben Cruachan, pumping from Loch Awe; Drax shelved its 600 MW expansion in 2025

Reißeck IIAustria430 MWgenerating capacityClosed-loop / lake systemoperatingDetails
Storage
Not published
Hydraulic head
595 m
Commissioned
2015
Stage
operating

Links the Reißeck and Malta groups, cycling water between the Mühldorfer See and Gößkar reservoirs

Aldeadávila IISpain421 MWgenerating capacityDuerooperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1986
Stage
operating

Two reversible sets inside the Duero canyon plant; the full Aldeadávila complex reaches 1,243 MW

La CocheFrance384 MWgenerating capacityIsèreoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1976
Stage
operating

France's first high-head pumped storage, above the Isère at Aigueblanche; an extra Pelton unit joined the four reversible sets in 2019

ThisavrosGreece384 MWgenerating capacityNestosoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
operating

Greece's largest hydro plant, a reversible station on the Nestos gorge near the Bulgarian border

Santa MassenzaItaly377 MWgenerating capacitySarcaoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
operating

Post-war cavern plant in Trentino that can pump back up to Lake Molveno

Tajo de la EncantadaSpain377 MWgenerating capacityGuadalhorceoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1978
Stage
operating

Spain's south-coast store above the El Chorro gorge of the Guadalhorce

BelmekenBulgaria375 MWgenerating capacityClosed-loop / lake systemoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
operating

Top stage of the Belmeken–Sestrimo–Chaira cascade in the Rila mountains; two of its five sets are reversible

HäuslingAustria360 MWgenerating capacityZilleroperatingDetails
Storage
Not published
Hydraulic head
696 m
Commissioned
1988
Stage
operating

Second Zillertal stage; pumps from the Ziller headwaters back up to the 186 m Zillergründl arch dam

Obervermuntwerk IIAustria360 MWgenerating capacityIlloperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
2019
Stage
operating

Cavern plant between the Silvretta and Vermunt reservoirs at the Ill's source; 360 MW in both turbine and pump mode

SäckingenGermany360 MWgenerating capacityRhineoperatingDetails
Storage
2.06 GWh
Hydraulic head
Not published
Commissioned
1967
Stage
operating

Cavern plant under the Eggberg with its basin on the Hotzenwald shoulder, tailing into the High Rhine

AguayoSpain360 MWgenerating capacityClosed-loop / lake systemoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1982
Stage
operating

Pumps from the Alsa reservoir in Cantabria's Besaya basin; Repsol has an expansion to ~1 GW on the books

FfestiniogUnited Kingdom360 MWgenerating capacityClosed-loop / lake systemoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1963
Stage
operating

Britain's first major pumped storage, between Llyn Stwlan and the Tan-y-Grisiau reservoir

Grimsel 2Switzerland348 MWgenerating capacityClosed-loop / lake systemoperatingDetails
Storage
Not published
Hydraulic head
400 m
Commissioned
1980
Stage
operating

KWO's cavern plant between the Oberaarsee and Grimselsee at the Aare headwaters; four ~87 MW sets, one converter-fed

AguieiraPortugal336 MWgenerating capacityMondegooperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1981
Stage
operating

Three reversible groups on the Mondego above Coimbra

BargiItaly330 MWgenerating capacityLimentraoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1975
Stage
operating

Two sets on the Suviana reservoir in the Apennines; offline since a fatal April 2024 machine-hall explosion, with repairs still running

Hohenwarte IIGermany320 MWgenerating capacitySaaleoperatingDetails
Storage
2.09 GWh
Hydraulic head
Not published
Commissioned
1966
Stage
operating

Eight small sets on the Saale cascade's Hohenwarte reservoir — the GDR's flagship store

SfikiaGreece315 MWgenerating capacityAliakmonasoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
operating

Three reversible sets on the middle Aliakmonas, regulating PPC's cascade below Mount Vermio

Puente BibeySpain315 MWgenerating capacityBibeioperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
operating

Mixed plant of the Sil system with pumping capability, downstream of the Conso group

Tashlyk PSPUkraine302 MWgenerating capacitySouthern BuhoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
2006
Stage
operating

Two of six planned 151 MW sets run beside the South Ukraine nuclear plant; unit 3 has crept forward for years

Sarganserland (Mapragg–Sarelli)Switzerland300 MWgenerating capacityTaminaoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
operating

Two-stage Tamina scheme with pumping between the Gigerwald reservoir and the Mapragg basin

FoyersUnited Kingdom300 MWgenerating capacityClosed-loop / lake systemoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1974
Stage
operating

Pumps from Loch Ness up the fault scarp to Loch Mhòr, reusing the site of the 1896 aluminium-works hydro

ConsoSpain298 MWgenerating capacityCambaoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1970
Stage
operating

Core of the San Agustín–Conso group in the Bibei headwaters of Galicia's Sil system

Rodund IIAustria295 MWgenerating capacityIlloperatingDetails
Storage
Not published
Hydraulic head
354 m
Commissioned
1976
Stage
operating

Single large reversible set beside Rodund I; rebuilt after a 2009 machine fire

Turlough HillIreland292 MWgenerating capacityClosed-loop / lake systemoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1974
Stage
operating

Ireland's only pumped storage, between an artificial summit basin and the glacial Lough Nahanagan in the Wicklow mountains

KühtaiAustria289 MWgenerating capacityClosed-loop / lake systemoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1981
Stage
operating

Pumping stage of TIWAG's Sellrain–Silz group, cycling the Finstertal and Längental reservoirs above the Inn

VelebitCroatia276 MWgenerating capacityZrmanjaoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1984
Stage
operating

Pumps from the Zrmanja up to the Opsenica basin on the Velebit karst plateau

Aurland IIINorway270 MWgenerating capacityClosed-loop / lake systemoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
operating

Reversible stage of the Aurland mountain cascade above the Sognefjord

Foz TuaPortugal270 MWgenerating capacityDourooperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
2017
Stage
operating

Dam on the lower Tua whose reversible sets pump against the Douro backwater

ValdecañasSpain249 MWgenerating capacityTajooperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
operating

Three reversible sets at the Valdecañas dam on the middle Tajo

TaloroItaly240 MWgenerating capacityTalorooperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
operating

Sardinia's pumped storage, between the Cucchinadorza and Benzone reservoirs on the Taloro

Kyiv PSPUkraine235.5 MWgenerating capacityDnieperoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1970
Stage
operating

The USSR's first big pumped storage (1970–72), on the shore of the Kyiv reservoir

RoßhagAustria231 MWgenerating capacityZemmoperatingDetails
Storage
Not published
Hydraulic head
630 m
Commissioned
1972
Stage
operating

Zemm valley plant pumping against the Schlegeis reservoir in the Zillertal group

LünerseeAustria229 MWgenerating capacityClosed-loop / lake systemoperatingDetails
Storage
Not published
Hydraulic head
974 m
Commissioned
1958
Stage
operating

Five sets between the Lünersee and the Latschau basin; illwerke's planned Lünerseewerk II would add 1,000 MW on the same lake

ErzhausenGermany220 MWgenerating capacityLeineoperatingDetails
Storage
1.1 GWh
Hydraulic head
Not published
Commissioned
1964
Stage
operating

Lower Saxony's only large PSH, with its basin on the Selter ridge above the Leine

WitznauGermany220 MWgenerating capacitySchlüchtoperatingDetails
Storage
0.63 GWh
Hydraulic head
Not published
Commissioned
1943
Stage
operating

Middle stage of the Schluchsee cascade, on the Schlücht between the Häusern and Waldshut steps

FadaltoItaly220 MWgenerating capacityClosed-loop / lake systemoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
operating

Mixed plant of the Piave–Santa Croce cascade, pumping between Lago Morto and Lago di Santa Croce

SouteloSpain215 MWgenerating capacityClosed-loop / lake systemoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
operating

Companion pumping plant to Conso in the Bibei headwaters

GuillenaSpain210 MWgenerating capacityRivera de HuelvaoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1973
Stage
operating

Three reversible sets north of Seville — Andalusia's counterweight to the Pyrenean stores

Salamonde IIPortugal207 MWgenerating capacityCávadooperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
operating

Single large reversible set in a cavern beside the 1953 Salamonde dam on the Cávado

DugeNorway200 MWgenerating capacitySiraoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1974
Stage
operating

Two reversible sets at the top of the Sira-Kvina system, between the Svartevatn and Gravatn reservoirs

SolinaPoland200 MWgenerating capacitySanoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1968
Stage
operating

Two of the four sets at Poland's tallest dam are reversible against the Myczkowce pool of the San; modernised 2003

Bolarque IISpain200 MWgenerating capacityTajooperatingDetails
Storage
Not published
Hydraulic head
240 m
Commissioned
1974
Stage
operating

Four reversible sets lift Tagus water 240 m to La Bujeda, the head pond of the Tagus–Segura transfer

MoraletsSpain200 MWgenerating capacityNoguera RibagorçanaoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
operating

Pumps from the Baserca reservoir up to Llauset, under the Pyrenean main ridge

Rodund IAustria198 MWgenerating capacityIlloperatingDetails
Storage
Not published
Hydraulic head
354 m
Commissioned
1952
Stage
operating

Workhorse of the Obere Ill–Lünersee group, between the Latschau basin and the Ill at Vandans

Liptovská MaraSlovakia198 MWgenerating capacityVáhoperatingDetails
Storage
Not published
Hydraulic head
48 m
Commissioned
1976
Stage
operating

Mixed plant on the Váh: two Kaplan sets work natural inflow, two reversible Dériaz sets pump from the Bešeňová pool

Frades I (Venda Nova II)Portugal191 MWgenerating capacityCávadooperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
2005
Stage
operating

First reversible extension of the Venda Nova scheme, from the Rabagão reservoir down to Salamonde

Kühtai 2Austria190 MWgenerating capacityClosed-loop / lake systemunder constructionDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
under construction

Two 95 MW pump-turbines and a new Kühtai reservoir; test operation began August 2026, regular service planned late 2027

Baixo SaborPortugal190 MWgenerating capacitySaboroperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
2016
Stage
operating

Two-step reversible scheme on the Sabor, the Douro's last wild tributary before it was dammed

AvčeSlovenia185 MWgenerating capacitySočaoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
2010
Stage
operating

Slovenia's only pumped storage, a variable-speed set above the Soča at Avče

FerreraSwitzerland180 MWgenerating capacityHinterrheinoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1962
Stage
operating

Kraftwerke Hinterrhein's pumping stage between the Valle di Lei reservoir and the Sufers pool on the Hinterrhein

EbenseeAustria170 MWgenerating capacityTraununder constructionDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
under construction

Energie AG shaft plant pumping out of the Traunsee; completion planned for 2027

TauernmoosAustria170 MWgenerating capacityClosed-loop / lake systemunder constructionDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
under construction

ÖBB's 16.7 Hz railway plant between the Weißsee and Tauernmoossee in the Stubach valley; misfabricated turbine spirals pushed commissioning to summer 2028

RobieiSwitzerland165 MWgenerating capacityBavonaoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1968
Stage
operating

Ofima's pumping hub in the Maggia system, cycling water between the Robiei and San Carlo basins in Val Bavona

Limberg IAustria160 MWgenerating capacityKapruner AcheoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
operating

The 1950s Kaprun Oberstufe between Mooserboden and Wasserfallboden; its generators are under repair through 2026 alongside Limberg III's

HappurgGermany160 MWgenerating capacityClosed-loop / lake systemunder constructionDetails
Storage
0.9 GWh
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
under construction

Offline since 2011 when the upper basin floor failed; Uniper is rebuilding it for a return around 2028

LangenprozeltenGermany160 MWgenerating capacitySinnoperatingDetails
Storage
0.95 GWh
Hydraulic head
Not published
Commissioned
1976
Stage
operating

Runs on the 16.7 Hz railway grid for DB Energie, above the Sinn in the Spessart

ŻydowoPoland157 MWgenerating capacityRadewoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1971
Stage
operating

Early lake-to-lake plant between Kamienne and Kwiecko lakes in Pomerania

HerdeckeGermany153 MWgenerating capacityRuhroperatingDetails
Storage
0.59 GWh
Hydraulic head
Not published
Commissioned
1989
Stage
operating

Replaced Arthur Koepchen's landmark 1930 machine hall on the Hengstey lake of the Ruhr

WaldshutGermany150 MWgenerating capacityRhineoperatingDetails
Storage
0.4 GWh
Hydraulic head
Not published
Commissioned
1951
Stage
operating

Bottom stage of the Schluchsee cascade, pumping straight out of the High Rhine

Pont Ventoux-SusaItaly150 MWgenerating capacityDora RipariaoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
operating

High-head Susa valley scheme with pumping between Val Clarea basins on the Dora Riparia

TorrãoPortugal146 MWgenerating capacityDourooperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1988
Stage
operating

Reversible plant at the Tâmega mouth, pumping from the Douro's Crestuma pool

Plate-TailleBelgium144 MWgenerating capacityEau d'HeureoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1981
Stage
operating

Sits on Belgium's largest artificial lakes, built to compensate Sambre water taken for cooling

FeldseeAustria140 MWgenerating capacityClosed-loop / lake systemoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
2009
Stage
operating

Kelag's two-set plant in the Fragant group of the Möll basin, between the Feldsee and the Wurten reservoir

RönkhausenGermany140 MWgenerating capacityGlingeoperatingDetails
Storage
0.74 GWh
Hydraulic head
Not published
Commissioned
1969
Stage
operating

Twin basins above the Lenne valley at Finnentrop, on the little Glinge stream

Waldeck IGermany140 MWgenerating capacityEderoperatingDetails
Storage
0.48 GWh
Hydraulic head
Not published
Commissioned
1933
Stage
operating

The 1930s pioneer above the Edersee, gutted and rebuilt with modern sets in 2010

Gargnano (San Giacomo)Italy137 MWgenerating capacityClosed-loop / lake systemoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1959
Stage
operating

Pumps between Lake Valvestino and Lake Garda from a shoreline hall on the west bank

TorrejónSpain132 MWgenerating capacityTajooperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
operating

Mixed plant pumping between the twin Torrejón pools on the Tajo and the Tiétar

Vilarinho das FurnasPortugal125 MWgenerating capacityCávadooperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1972
Stage
operating

Draws down the Homem valley reservoir — famous for the drowned village it covers — and pumps back from Salamonde

TanesSpain123 MWgenerating capacityNalónoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
operating

Reversible sets between the Tanes and Rioseco reservoirs on the upper Nalón in Asturias

EtzelwerkSwitzerland121 MWgenerating capacityClosed-loop / lake systemoperatingDetails
Storage
Not published
Hydraulic head
473 m
Commissioned
1937
Stage
operating

SBB's 16.7 Hz railway plant between the Sihlsee and Lake Zurich at Altendorf

Malta OberstufeAustria120 MWgenerating capacityMaltaoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
Not yet / unknown
Stage
operating

Two sets at Galgenbichl lift Malta water up to Kölnbrein; rebuilt for variable-speed operation 2019–2024

GeesthachtGermany120 MWgenerating capacityElbeoperatingDetails
Storage
0.6 GWh
Hydraulic head
Not published
Commissioned
1958
Stage
operating

Vattenfall's circular basin on the Geest bluff, pumping straight out of the tidal Elbe

CapriatiItaly113 MWgenerating capacityVolturnooperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1963
Stage
operating

Pumps between Lake Matese, high on the massif, and the Volturno valley

HäusernGermany100 MWgenerating capacitySchwarzaoperatingDetails
Storage
0.46 GWh
Hydraulic head
Not published
Commissioned
1931
Stage
operating

Top stage of the Schluchsee cascade, working the Black Forest's Schluchsee against the Schwarza basin

RužínSlovakia60 MWgenerating capacityHornádoperatingDetails
Storage
Not published
Hydraulic head
52.7 m
Commissioned
1973
Stage
operating

Slovakia's first reversible-turbine plant, between the Ružín and Ružín II pools of the Hornád above Košice

Štěchovice IICzechia45 MWgenerating capacityVltavaoperatingDetails
Storage
Not published
Hydraulic head
219.5 m
Commissioned
1947
Stage
operating

Upper basin on Homole hill above the Vltava cascade; rebuilt with a single 45 MW reversible set in 1996

DobšináSlovakia24 MWgenerating capacityClosed-loop / lake systemoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1953
Stage
operating

Transfers Hnilec water from Palcmanská Maša across the ridge into the Slaná basin — a 1953 inter-basin plant

Mikšová IISlovakia2.6 MWgenerating capacityVáhoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1963
Stage
operating

The 1963 experimental unit where the reversible turbines for Ružín and Liptovská Mara were proven

Černé jezeroCzechia1.9 MWgenerating capacityÚhlavaoperatingDetails
Storage
Not published
Hydraulic head
Not published
Commissioned
1930
Stage
operating

The first pumped-storage plant in Czechia (1930), between the glacial Černé jezero and a small basin on the Úhlava