English
БългарскиHrvatskiČeštinaDanskNederlandsEnglishEestiSuomiFrançaisDeutschΕλληνικάMagyarGaeilgeItalianoLatviešuLietuviųMaltiPolskiPortuguêsRomânăSlovenčinaSlovenščinaEspañolSvenska
Labe + Elbe river system

… main-stem GPS gauges · Czechia + Germany

Feeds live
Powered byTERRA 2100
Back to mapRiver statistics
RiverData.org · Rivers

Two Forty-One Creek · official station profile

The Two Forty-One Creek, headwaters on the left. Side rivers drop in from above with the flow they deliver, each arrow landing on the water where it joins; reservoirs and their latest operator readings sit on the way down.

Two Forty-One Creek1 gauges · 1 countryOpen mapEmbed this map
RiversCurrently viewingTwo Forty-One Creek1 gaugestation map1 reporting country
Switch river
Loading official river coverage for the selector...
Unbenchmarked
None of the 1 gauges on this stem carries an operator threshold or a stored seasonal reference, so flow is shown but not judged.
ProfileStation sequence · distance unavailable · schematic, no elevation axis
Gauges1 Canada 1
Source to sea flow0 to 0 m³/s
Side rivers joining0 +0 canals
River power now0 MW · 0/0 reaches
Two Forty-One Creek · long profileelevation and distance · water band thickness = discharge · colour = flow vs seasonal normal
Live nowFlow 1/1 gauges reporting22:40 UTC
schematicstation sequence (distance unavailable)0flow reference unavailable · readings are not classified as normalCanada · 1
coloured strip: river discharge vs long-term normal (100% = normal for this season, not reservoir fill)no long-term referencewater band thickness = dischargereach power (ρgQΔh)flow drops downstreamCzechiaGermany
The basin behind the river

People, dams and institutions

Basin context loads as you approach this section.

Main-stem gaugessource to outlet · select one for its sensor detail

Reference gauge: Two Forty-One Creek Near Penticton0 m³/s · the furthest-downstream main-stem gauge currently reporting flow, so it captures the largest accumulated upstream reach.

Published station elevations come from the named provider. The river is drawn schematically because comparable elevations are missing. Station order is a presentation sequence, not verified upstream-to-outlet routing. River power is gravitational power carried by the flow (ρ·g·Q·Δh), not metered generation - it is a floor rather than a total, because a reach whose downstream gauge reports no discharge contributes nothing. The navigability line is an indicative planning threshold, not an official fairway forecast. Side-river positions are approximated to the nearest main-stem gauge. A reservoir is drawn at its operator's own chainage where it stands on this river, and at the confluence where it stands on a side river of it - never at a kilometre borrowed from another river's scale.

Map layersexpand
major river · clickable tributary / branch · clickable selected downstream path final outlet latest official Q European model comparison operating nuclear plant core reservoirEurope · 26 Sept 2026