English
БългарскиHrvatskiČeštinaDanskNederlandsEnglishEestiSuomiFrançaisDeutschΕλληνικάMagyarGaeilgeItalianoLatviešuLietuviųMaltiPolskiPortuguêsRomânăSlovenčinaSlovenščinaEspañolSvenska
Labe + Elbe river system

… main-stem GPS gauges · Czechia + Germany

Feeds live
Powered byTERRA 2100
Back to map
RiverData.org · Rivers

Lužnice · source to mouth

The Lužnice, headwaters on the left. Side rivers drop in from above with the flow they deliver, each arrow landing on the water where it joins; reservoirs and their latest operator readings sit on the way down.

Lužnice7 gauges · 1 countryOpen mapEmbed this map
RiversCurrently viewingLužnice7 gaugescascade and station map1 reporting country
Switch river
Loading official river coverage for the selector...
Unbenchmarked
None of the 7 gauges on this stem carries an operator threshold or a stored seasonal reference, so flow is shown but not judged.
Profile150 km · schematic, no elevation axis
Gauges7 Czechia 7
Source to sea flow- to - m³/s
Side rivers joining0 +0 canals
River power now0 MW · 0/6 reaches
Lužnice · long profileelevation and distance · water band thickness = discharge · colour = flow vs seasonal normal
Live nowFlow 0/7 gauges reportingStale flow 7 gauges
schematic100published river kilometresstalestalestalestalestalestalestaleflow reference unavailable · readings are not classified as normalCzechia · 7
coloured strip: river discharge vs long-term normal (100% = normal for this season, not reservoir fill)water band thickness = dischargereach power (ρgQΔh)flow drops downstreamCzechiaGermany
The basin behind the river

People, dams and institutions

Basin context loads as you approach this section.

Main-stem gaugessource to outlet · select one for its sensor detail

Published station elevations come from the named provider. The river is drawn schematically because comparable elevations are missing. River power is gravitational power carried by the flow (ρ·g·Q·Δh), not metered generation - it is a floor rather than a total, because a reach whose downstream gauge reports no discharge contributes nothing. The navigability line is an indicative planning threshold, not an official fairway forecast. Side-river positions are approximated to the nearest main-stem gauge. A reservoir is drawn at its operator's own chainage where it stands on this river, and at the confluence where it stands on a side river of it - never at a kilometre borrowed from another river's scale.

Map layersexpand
major river · clickable tributary / branch · clickable selected downstream path final outlet latest official Q European model comparison operating nuclear plant core reservoirEurope · 27 Sept 2026