English
БългарскиHrvatskiČeštinaDanskNederlandsEnglishEestiSuomiFrançaisDeutschΕλληνικάMagyarGaeilgeItalianoLatviešuLietuviųMaltiPolskiPortuguêsRomânăSlovenčinaSlovenščinaEspañolSvenska
Oder river system

4 main-stem GPS model cells · GloFAS v4

Feeds live
Powered byTERRA 2100
Back to map
RiverData.org · Rivers

Bóbr · source to mouth

The Bóbr, headwaters on the left. Side rivers drop in from above with the flow they deliver, each arrow landing on the water where it joins; reservoirs and their latest operator readings sit on the way down.

Bóbr14 gauges · 1 countryOpen mapEmbed this map
RiversCurrently viewingBóbr14 gaugescascade and station map1 reporting country
Switch river
Loading official river coverage for the selector...
Unbenchmarked
None of the 14 gauges on this stem carries an operator threshold or a stored seasonal reference, so flow is shown but not judged.
Profile275 km · 499 m fall
Gauges14 Poland 14
Source to sea flow0.12 to 14.1 m³/s
Side rivers joining0 +0 canals
River power now19 MW · 10/13 reaches
Bóbr · long profileelevation and distance · water band thickness = discharge · colour = flow vs seasonal normal
Live nowFlow 10/14 gauges reporting06:50 UTC
36160285410535m a.s.l.200100published river kilometresflows intoOder to-0.120.260.421.533.524.126.5311.216.214.1-flow reference unavailable · readings are not classified as normalPoland · 14
coloured strip: river discharge vs long-term normal (100% = normal for this season, not reservoir fill)no long-term referencewater band thickness = dischargereach power (ρgQΔh)flow drops downstreamCzechiaGermany
The basin behind the river

People, dams and institutions

Basin context loads as you approach this section.

Main-stem gaugessource to outlet · select one for its sensor detail

Reference gauge: Nowogród Bobrzański14.1 m³/s · the furthest-downstream main-stem gauge currently reporting flow, so it captures the largest accumulated upstream reach.

Published station elevations come from the named provider. River power is gravitational power carried by the flow (ρ·g·Q·Δh), not metered generation - it is a floor rather than a total, because a reach whose downstream gauge reports no discharge contributes nothing. The navigability line is an indicative planning threshold, not an official fairway forecast. Side-river positions are approximated to the nearest main-stem gauge. A reservoir is drawn at its operator's own chainage where it stands on this river, and at the confluence where it stands on a side river of it - never at a kilometre borrowed from another river's scale.

Map layersexpand
major river · clickable tributary / branch · clickable selected downstream path final outlet latest official Q European model comparison operating nuclear plant core reservoirEurope · 27 Sept 2026