Črpalna hidroelektrarna · Mrežni baterijski
Limberg III
operatingAustria · spodnji rezervoar na Kapruner Ache
- Kapaciteta turbine
- 480 MW
- Shranjevanje energije
- -
- Ogabna glava
- -
- Prva enota
- 2025
Opened September 2025 on the same reservoir pair as Limberg II; both motor-generators failed within weeks, with repaired sets due back in September and December 2026
Številke in koordinate na tablici: Verbund press release · 47.1985, 12.7205