Pompenergiecentrale · Grid-batterij
Limberg III
operatingAustria · Lager stuwmeer op de Kapruner Ache
- Turbinecapaciteit
- 480 MW
- Energieopslag
- -
- Vies hoofd
- -
- Eerste eenheid
- 2025
Opened September 2025 on the same reservoir pair as Limberg II; both motor-generators failed within weeks, with repaired sets due back in September and December 2026
Naamplaatfiguren en coördinaten: Verbund press release · 47.1985, 12.7205