Idro ta' ħażna bil-pompa · Batterija tal-Grid
Limberg III
operatingAustria · Reservoir ta' isfel fuq il-Kapruner Ache
- Kapaċità tat-turbina
- 480 MW
- Ħażna tal-enerġija
- -
- Gross head
- -
- L-ewwel unità
- 2025
Opened September 2025 on the same reservoir pair as Limberg II; both motor-generators failed within weeks, with repaired sets due back in September and December 2026
Figuri u koordinati tal-pjanċi tal-isem: Verbund press release · 47.1985, 12.7205