Hidroelektrana s pumpnim skladištenjem · Mrežna baterija
Limberg III
operatingAustria · donji rezervoar na Kapruner Ache
- Kapacitet turbine
- 480 MW
- Skladištenje energije
- -
- Gadna glava
- -
- Prva jedinica
- 2025
Opened September 2025 on the same reservoir pair as Limberg II; both motor-generators failed within weeks, with repaired sets due back in September and December 2026
Brojevi i koordinate na pločicama: Verbund press release · 47.1985, 12.7205