Hidrea stórála caidéalaithe ·
Limberg III
operatingAustria · taiscumar níos ísle ar an Kapruner Ache
- Cumas tuirbín
- 480 MW
- -
- Ceann comhlán
- -
- An chéad aonad
- 2025
Opened September 2025 on the same reservoir pair as Limberg II; both motor-generators failed within weeks, with repaired sets due back in September and December 2026
Figiúirí agus comhordanáidí ainmchláir: Verbund press release · 47.1985, 12.7205