Pumped-storage hydro · grid battery
Tauernmoos
under constructionAustria · closed loop, no river attached
- Turbine capacity
- 170 MW
- Energy storage
- -
- Gross head
- -
- First unit
- -
ÖBB's 16.7 Hz railway plant between the Weißsee and Tauernmoossee in the Stubach valley; misfabricated turbine spirals pushed commissioning to summer 2028
Nameplate figures and coordinates: ÖBB project page · 47.1525, 12.6442