Pumped-storage hydro · grid battery
Kühtai 2
under constructionAustria · closed loop, no river attached
- Turbine capacity
- 190 MW
- Energy storage
- -
- Gross head
- -
- First unit
- -
Two 95 MW pump-turbines and a new Kühtai reservoir; test operation began August 2026, regular service planned late 2027
Nameplate figures and coordinates: press report (June 2026) · 47.1956, 11.0037