Pumped-storage hydro · grid battery
Dinorwig
operatingUnited Kingdom · closed loop, no river attached
- Turbine capacity
- 1,728 MW
- Energy storage
- 9.1 GWh
- Gross head
- -
- First unit
- 1984
Europe's fastest-responding big store, inside Elidir mountain between Marchlyn Mawr and Llyn Peris
Nameplate figures and coordinates: Wikipedia · 53.1178, -4.1073