Pumped-storage hydro · grid battery
Bolarque II
operatingSpain · lower reservoir on the Tajo
- Turbine capacity
- 200 MW
- Energy storage
- -
- Gross head
- 240 m
- First unit
- 1974
Four reversible sets lift Tagus water 240 m to La Bujeda, the head pond of the Tagus-Segura transfer
Nameplate figures and coordinates: engineering contractor page · 40.3624, -2.8186