Pumped-storage hydro · grid battery
Bargi
operatingItaly · lower reservoir on the Limentra
- Turbine capacity
- 330 MW
- Energy storage
- -
- Gross head
- -
- First unit
- 1975
Two sets on the Suviana reservoir in the Apennines; offline since a fatal April 2024 machine-hall explosion, with repairs still running
Nameplate figures and coordinates: Wikipedia · 44.1167, 11.0431