Limberg III
operatingAustria · Nedre reservoir på Kapruner Ache
- Turbinekapacitet
- 480 MW
- Energilagring
- -
- Ulækkert hoved
- -
- Første enhed
- 2025
Opened September 2025 on the same reservoir pair as Limberg II; both motor-generators failed within weeks, with repaired sets due back in September and December 2026
Navnepladetal og koordinater: Verbund press release · 47.1985, 12.7205